Toronto, ON - TheNewswire - March 18, 2020 - South Star Mining Corp. ('South Star' or 'the Company') (TSXV:STS) (OTC:STSBF), further to its February 5, 2020 News Release, has filed a National Instrument 43-101 technical report dated March 18, 2020 and entitled "Updated Resources and Reserves Estimate and Pre-feasibility Study on the Santa Cruz Graphite Project, Bahia, Brazil" (the "Report" or "PFS"). There are no material differences between the mineral resources, mineral reserves or results disclosed in the Report and those disclosed in the Company's February 5th, 2020 news release. The Report can be found under the Company's SEDAR profile at www.sedar.com.

The PFS presents a two-phased approach to production with an after tax NPV5% of US$81.2M, an IRR of 35% and a 4-year payback. The study used the current average basket price of US$1,287 per tonne which was held constant for the life of the project.

Phase 1 consists of a pilot plant with the capacity to produce 5,000t of concentrate per year, and the simple layout includes a small open-pit processing plant with filtered tails technology, waste storage facility for co-disposal of waste-rock and filtered tails and civil infrastructure. The goal of the Phase 1 operations is to test and optimize the flowsheet, develop the key commercial relationships and optimize the production of products demanded in the marketplace, given the inherent, high-quality nature of the concentrates produced to date. Detailed engineering of the pilot plant was completed as part of the PFS.

Phase 2 is a larger plant with similar layout and technology, but with a capacity of 25,000t of concentrate per year. It's important to highlight that both Phases include the use of filtered tails technology and co-disposal of tailings with waste-rock to avoid the requirement of a Tailings Storage Facility. This is essential in facilitating the permitting process and decreasing the environmental footprint of the facility.

PFS Highlights

- Combined Maiden Proven & Probable (P+P) Reserve Estimate of 12.3M tonnes with strong conversion of resource to reserves.

- The Mineral Reserve Estimate is listed below:

  Mineral Reserve Estimate

Tonnage

Cg

In-situ Graphite

(t)

(%)

(t)

  Proven

3,989,635

2.49

99,340

  Probable

8,318,795

2.35

195,490

  Total P &P

12,308,500

2.40

295,400

Notes:

  1. Mineral Reserves are as defined by the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves.

  2. Mineral Reserves are based on Mineral Resources (Published on July 8th, 2019) estimated using ordinary kriging method and a three-dimensional block model using a cut-off grade of 0.75% and 1% Cg, depending on the modeled zones.

  3. Numbers have been rounded.

  4. Mineral Reserves have incorporated cut-off, pricing, costs, recovery & FX.

- Phase 1 Average Production of 5,000 tpy of 95% Cg Concentrate in Years 1 & 2

- Phase 2 Ramping up from 13,500 tpy of 95% Cg Concentrate in Year 3 to an average production of 25,000 tpy in years 4-11

- Average Basket Price of Products of US$1,287/t

- Open-pit mining with strip ratio of 1.6 Life of Mine (LOM)

- 12-Year LOM

- Exchange Rate of R$3.95 to US$1.00

- Post-Tax NPV5% of US$81.2M and internal rate of return of 35%

- US$129M Post-tax Cash Flow LOM

- Payback Period of 4 years

- CAPEX & OPEX Parameters for Each Phase are listed below:

  Parameter

Phase 1

(US$)

Phase 2

(US$)

Phase 1 & 2

(US$)

  CAPEX

7.3M

27.2M

34.5

  OPEX ($/t Concentrate)

604

386

396

- Sensitivity Analysis for NPV using CAPEX, OPEX, Sales Price and FX as follows:

SouthStarMining3182020

The technical information contained in this news release pertaining to the Santa Cruz Graphite Project has been prepared, reviewed and approved by Luiz Eduardo Pignatari, an independent qualified person under National Instrument 43-101-Standards of Disclosure for Mineral Projects ("NI43-101"). The qualified person has verified the information disclosed herein, including the sampling, preparation, security and analytical procedures underlying such information, and is not aware of any significant risks and uncertainties that could be expected to affect the reliability or confidence in the information discussed herein.

About South Star Mining Corp.

South Star Mining Corp. is focused on the selective acquisition and development of near-term mine production projects in Brazil to maximize shareholder value. STS has an experienced executive team with a strong history of discovering, developing, building and operating profitable mines in Brazil.

The Santa Cruz Graphite Project is located in Southern Bahia in the third largest graphite producing region in the world with over 70 years of continuous mining. The Project has at surface mineralization in friable materials, and successful large-scale pilot plant testing (>30t) has been completed. The results of the testing show approximately 65% of Cg concentrate is +80 mesh with good recoveries and 95-99% Cg. With excellent infrastructure and logistics, South Star is carrying its development plan towards production projected at the end of 2020.

To learn more, please visit the Company website at http://www.southstarmining.ca.

On behalf of the Board,

Mr. Richard Pearce
Chief Executive Officer

For additional information, please contact:

CHF Capital Markets
Cathy Hume, CEO
Phone: 416-868-1079 x231
Email: cathy@chfir.com

Mr. Dave McMillan
Chairman
Email: davemc@telus.net

Mr. Eric Allison
Director
Email: eric@southstarmining.ca

CAUTIONARY STATEMENT

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Forward-Looking Information

The information contained herein contains "forward-looking statements" within the meaning of applicable securities legislation. Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be "forward-looking statements."